Welcome Guest to Defaut site!

Planning System

No todos found for this project. Add a todo

Sub-Project: Planning System Analysis & Integration Mapping

  • Description: Analyze existing text-based planning system and map to database-driven structure. Completed 2026-02-07. Deliverables: 8 analysis documents (164KB)
  • Start Date: 2026-02-18
  • End Date: 2026-02-21
  • Status: Delivered
  • Project Code: PLAN-ANALYSIS
  • Project Size: 1000
  • Estimated Man Hours: 1000
  • Developer Name: shanta
  • Client Name: CSC
  • Comments: analazie of plann

No todos found for this project. Add a todo

Sub-Project: Project management

  • Description: This project is the master management for our project system
  • Start Date: 2024-02-13
  • End Date: 2024-09-13
  • Status: In-Process
  • Project Code: Project
  • Project Size: 13
  • Estimated Man Hours: 49
  • Developer Name: Shanta
  • Client Name: CSC
  • Comments: our Project management system
📋 Todos for Project management (11)
Subject Description Start Date Due Date Status Priority Accumulated Time Actions
site name list not working The list should display all the sites for the server it the SiteName is CSC or just the SiteName of the site for all other sites. 2024-11-26 2024-11-29 Completed Critical 0h 0m
fix project details add button to go to todo each todo should show total time accumnulate project should show total time spent each todo should have a list of all the log entires w 2024-12-18 2025-01-04 Completed When we have time 0h 0m
add project return an empty page add project return an empty page 2025-01-03 2025-02-08 Completed Critical 0h 0m
Add new project Documentation. Add new project Documentation. 2025-08-25 2025-09-25 Completed Critical 0h 0m
add new project for the Encyclopedia Of Biological Life system Reference current_session.md to give you an idea what to fill in here and add ENCY.tt as the key Documentation system file for the system 2025-10-01 2025-10-08 Completed Critical 0h 0m
code toggles the null switch, which removes the passed parent id code toggles the null switch, which removes the passed parent id. We need to turn off the code setting the entry to nl 2025-10-01 2025-10-04 Completed Critical 0h 0m
The displayed description area of a project The displayed description area of a project needs to display the details of all the field in the project record. 2025-10-01 2025-11-08 New Critical 0h 0m
Time is not accumulateing accumulating in project views. Time is not accumulating in project views. 2025-10-05 2025-10-10 New When we have time 0h 0m
Add global containers to all project pages. Add global containers to all project pages. 2025-10-05 2025-10-05 New When we have time 0h 0m
add system to track printing add system to track printing 2025-10-08 2027-10-27 New When we have time 0h 0m
Sub-project container details expansion On the :3000/project/project page, the containers for sub-projects should open to give details for the sub-project in the same manner as the details for the main project gives. 2026-02-12 2025-10-30 New Critical 0h 0m

Total Accumulated Time for All Projects: